Specifications include, but are not limited to: LK-A1 Installation of 138kV, Tall, 3-Phase 8’ Spacing Bus Support Stand, Used for 23'-00" Bus Height (S-29, Dwg. LK-3112). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 19 LK-A2 Installation of 138kV, Short, 3-Phase 12’ Spacing Bus Support, Used for 15'-00" Bus Height (S-30, Dwg. LK-3113). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 12 LK-A3 Installation of 138kV, Tall, 3-Phase 12’ Spacing Bus Support Stand, Used for 23'-00" Bus Height (S-31, Dwg. LK-3114). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 13 LK-A4 Installation of 138kV, XTRA Tall, 3-Phase 12’ Spacing Bus Support Stand, Used for 25'-00" Bus Height (S-32, Dwg. LK-3115). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 6 LK-A5 Installation of 138kV, Short, 1-Phase Bus Support Stand, Used for 15'-00" Bus Height (S-33, Dwg. LK-3116). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 68 LK-A6 Installation of 138kV, Tall, 1-Phase Bus Support Stand, Used for 23'-00" Bus Height (S-34, Dwg. LK-3117). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of ____________________________________________dollars and _____________________cents per EACH. EA 36 LK-A7 Installation of 138kV, Short, 3-Phase Air Switch Stand,15'-00" Height (S-35, Dwg. LK-3118). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of _______________________________________________dollars and _________________cents per EACH. EA 5 LK-A8 Installation of 138kV CT/P.T. Combo Unit Stand-Short w/Junction Box (S-36, Dwg. LK-3119). Erection of the structure to include any field modifications, additional hardware, and all incidentals necessary to make a complete installation per project drawings and specifications for the sum of __________________________________________dollars and ____________________cents per EACH. EA 3 LK-A9 Installation of 138kV Bus Work and Station Post Insulators (Dwgs. LK-0900-5; LK-1001-1,2,3; LK-1002-1,2-5,8,9) including temporary hardware changes with nearby insulators/fittings required to lift/lower the bus, bus connectors, rental of DMC equipment to install bus work and any miscellaneous hardware necessary to construct a complete system of bus work per project drawings and specifications for the LUMP SUM of ___________________________________________________________ dollars and _______________________ cents. LS 1 LK-A10 Removal and Hauloff of 138kV Bus Work and Station Post insulators (Dwgs. LK-1001-1,2,3; LK-1002-1,2-5,8,9) including temporary hardware changes with nearby insulators/fittings required to lift/lower the bus, bus connectors, rental of DMC equipment to install bus work and any miscellaneous hardware necessary to construct a complete system of bus work per project drawings and specifications for the LUMP SUM of ___________________________________________________________ dollars and _______________________ cents.