Specifications include, but are not limited to: ▪ Repair existing gate or butterfly waterline valves from 2-inch to 108-inch in diameter. ▪ Install new gate or butterfly valves from 2-inch to 108-inch in diameter. ▪ Providing traffic control, including off-duty or uniformed police officers. ▪ Excavating to depths up to 20-feet. ▪ Shoring trenches in accordance with all applicable occupation safety regulations. ▪ De-watering of excavations. ▪ Plating of trenches overnight for public safety. ▪ Repairing/relocating/installing by-pass piping and valves. ▪ Working in confined spaces, vaults or shored excavations. ▪ Operating valves by hand or with appropriate power tools. ▪ Removing inspection plates and examining gear boxes for deficiencies. ▪ Repair, replace or install manual or motorized valve actuators. ▪ Cleaning, lubricating and re-packing gear boxes. ▪ Constructing manholes over valve operators. ▪ Backfilling and providing temporary and/or permanent pavement replacement. ▪ Providing clean-up and disposal of surplus material and restoring the job sites. ▪ Installing extensions and stabilizers on valve operators. ▪ Installing debris caps in valve boxes. ▪ Providing a “Repairs Accomplished” report for every location. This report will include at a minimum, the following information: a. Valve make, model, and serial number. b. Comprehensive description of work accomplished. c. Specific parts replaced, source of parts/repairs. d. Assessment of water works equipment. e. Depth of manhole floor (base) below pavement surface. f. Shop drawings, operation and maintenance information for any replacement valves. g. Record drawings of repairs. ▪ All other work as it relates to this JOC.