Specifications include, but are not limited to: A. The Contractor shall remove the wood siding from both ends, and on rear side of building and shall remove existing board fencing around the loading dock. B. The Contractor shall install 6-inch lap LP Smart siding. All siding shall be installed using #6 galvanized nails. C. The Contractor shall install 1-inch x 4-inch LP Smart siding trim on corners and around doors, windows, and gable trim. All trim shall be installed using #8 galvanized nails. D. The Contractor shall build new board fence that matches the fencing that is being replaced. Same size posts 4-inch x 4-inch and same size 1-inch x 6-inch boards as existing fence. All boards on fence shall be fastened using 2 ½ -inch galvanized screws. E. The Contractor shall caulk siding and trim with Dap 230 Duraflex caulking. F. The Contractor shall apply two coats of Sherwin Williams lifetime warranty paint on siding, soffit and facia, front entrance porch, and all door and window trim on entire building (park staff shall choose paint colors). G. The Contractor shall paint new board fence with two coats of Sherwin Williams lifetime warranty exterior paint (park staff shall choose paint color). H. The Contractor shall remove and replace loading dock kitchen exterior doors with same doors as existing and prime and paint to match existing.