Specifications include, but are not limited to: The SOE Facility (Project) includes, but not limited to; building design, site development costs, construction, construction administration, furniture, fixtures, equipment, professional fees, soft costs, appropriately sized parking lots, site lighting, landscaping, signage, security measures, value engineering, and all turnkey building costs. Two pre-engineered metal buildings are desired to contain costs. The Project will consist of two metal buildings of approximately one hundred (100) foot in width and two hundred (200) foot in length. The Administration Building (B1) will have a twelve (12) foot eave height. The Warehouse Building (B2) will have a twenty (20) foot eave height and include up to four (4) overhead doors for the loading dock area.