Specifications include, but are not limited to: A. The Ogden Hall Complex is a Historic Structure. 1. All repairs and replacements must meet Historic Guidelines. 2. Pre-approval must be received in writing from Greg Hart, and Shayla Albey prior to beginning any work on the structure. B. General Specifications Log Cabin Painting: 1. Prospective Contractor shall adherence to the paint, stain and manufactures guidelines, and shall adhere to labeling requirements, which includes painting during appropriate temperature and humidity levels. 2. Prospective Contractor shall prepare all wood surfaces for painting and staining, which includes but is not limited to making sure all wood and other surfaces are pressure washed, cleaned, and thoroughly dried. 3. Prospective Contractor shall nail any loose existing siding and cornice and shall replace and match all bad and rotten wood or siding with equivalent sizes and thicknesses. 4. Prospective Contractor shall apply paint stain and to best match existing color tint as close as possible. Painting and stain must be approved by Park Superintendent. 5. Prospective Contractor shall furnish all tools, materials, equipment, and labor necessary to prep the wood, logs, and windows to complete the project for estimated 1’009 square foot structurez