Specifications include, but are not limited to: A.Work to be done includes furnishing all labor, materials, equipment, and services (development and testing) required for construction of one (1) 6-inch bedrock irrigation well.1.Locationisidentifiedas“BaseBidDrillingLocation”on the Drawings.2.“AlternativeDrillingLocation”shallbeconsideredshould“BaseBidDrillingLocation”isdeemed not reliable for irrigation after drilling and testing.3.DonotdemobilizefromsitewithoutdiscussionwithOwner’sRepresentativeandEngineer.B.Well location shall be located by project hydrogeologist prior to staking. Drill in exact location asstaked by hydrogeologist.C.Review access to site prior to bid submission and coordinate with Owner’s Representative.D.Irrigation well construction consists of:1.Overburden drilling operation2.Installing the well casing through overburden and sealed 20 feet into bedrock3.Bedrock drilling operation4.Hydrofracturing to maximize aquifer openings5.Testing for yield, drawdown, and water quality6.Protecting aquifer quality7.Setting pump and drop pipe within bedrock well8.Pitless adapter installation at surface for horizontal discharge9.Capping conduit and pipe at surface for future installation of pump control equipment E.Target yield in gallons per minute (gpm) for the proposed well shall be 40-50 gpm. Test and develop well for maximum possible sustainable flow.F. Assumed Bedrock Drilling Depth = 600 fee