Specifications include, but are not limited to: a.The work includes a new metal enclosure for the ATS and Panel DP, generator withenclosure, ATS, wiring and connection to existing panels that are being refed, removal ofexisting feeders after feeder replacement, electrical, as well as lighting, utilities, and all other work incidental thereto in accordance with the Plans and Specifications.b. Furnish and install secondary power conduit and wiring from the nearby utilitytransformer to the new Panel DP including trenching and backfilling, conduit, wire,supports, brackets, junction boxes, etc. required to provide all work.c.Remove and stack the existing temporary shed and equipment not to be reincorporatedinto the work.d.Removal of all fire damaged items: generator, ATS, panels, wiring, metering, conduit,etc.e.Furnishing and installing secondary power conduit and wiring from the nearby utilitytransformer, metering, conduit, wire, supports, brackets, junction boxes, etc. required toprovide all work.f.Provision of emergency and exit lighting in existing garage. This shall include all wiring,conduit, fittings, lighting, connections, etc for a code compliant emergency egress installation