Specifications include, but are not limited to: he proposed improvements are as follows: In 2023 the City of Mesa, with partner agencies Maricopa County Department of Transportation (MCDOT)and the Town of Gilbert, completed a design concept report (DCR) that identified the improvement needsfor the corridor from the north side of the SR 202 (approximately ½ mile south of Warner Road) to thesouth side of the East Maricopa Floodway (EMF). The development of this roadway will add roadwaycapacity and connectivity in this rapidly developing area.The project is currently funded with local funds. However, federal funding may be utilized for constructionbased on funding availability and timing of the project. The plan for funding will be finalized through theIGA process. If federal funding is incorporated into the project all appropriate federal requirements willapply including but not limited to environmental, right of way, and utility requirements and clearances.The proposed roadway improvements include the following:•A fully improved 6-lane section with bike lanes, a raised landscaped median with irrigation, anddual left turns at arterial intersections.•New full-depth asphalt pavement•Storm drain, curb and gutter, sidewalks, and commercial driveways•Streetlight improvements•Traffic signals at Nunneley Road, Warner Road, Elliot Road and traffic improvements as needed.•Intersection improvements with ADA-compliant sidewalk ramps and pedestrian equipment•Signing and pavement marking