Specifications include, but are not limited to: Install a 20-year warranty urethane-coated SPFR roof system on six (6) of ten (10) roofsections of the Seaton Center. The project includes: Infrared scan to locate possible wetinsulation, Remove wet insulation and replace with like material, Mechanically attach½"Densdeck over existing roof membrane, Replace the coping on the perimeter walls with a newfoam stop and apply new foam and coatings. Remove parapet wall flashings and apply foamand coatings, Re-construct building expansion joints between Lancaster Aquatics and SeatonCenter. Re-construct building expansion joint between Johnson Center and Seaton Center.Renovate existing field expansion joints to original condition, install a ladder between Upper Section 2 and Lower Section 5, and Install 20-year urethane-coated Foam Roof System. Building outages and electrical hook up by UK PPD included