Specifications include, but are not limited to: Mobilization/demobilization; • Communication and coordination with the Federal Bureau of Prisons (FBP) for drilling the 6 gas monitoring probes on the FBP property. Work is to be completed in accordance with a Temporary Permit issued to the City by the BOP; • Site work including clearing vegetation and/or trees and preparation of drilling locations to provide access to the proposed soil gas ventilation wells and gas monitoring probe locations; • Site work and drilling including preparing drilling locations, drilling of vents and probes; • Furnish materials and provide labor required for construction of the soil gas ventilation wells and gas monitoring probes including: o Drilling using equipment suitable to reach the required depths; o PVC pipe and fittings; o Solar fan vents for soil gas ventilation wells; o Stone, aggregate, bentonite, and cement mixtures needed for well and probe construction; o Gas monitoring probe casing and caps, and; • Cleanup and any other ancillary work including restoration of all disturbed property on the Bureau of Prisons property to the original condition