Specifications include, but are not limited to: Plumbing: • Remove existing sink and faucet, maintain existing hot and cold water and waste and vent piping for the new sink. • Install new sink in location of removed sink, connect to existing hot and cold water, waste, and vent piping, and provide new P-Trap and angle stops. Mechanical: • Remove and relocate existing control valve, Fin Tube radiation. Clean the existing cover and reinstall. Cap existing supply and return piping for future connection. • Remove and relocate the control valve and hydronic, and clean and reinstall the existing enclosure. • Remove and relocate existing return grille, cap ductwork, insulate, and clean for future installation. • Remove and relocate the existing thermostat, timer switch, and wall sensor and retain it for future installation. • Install existing radiation approx. 3.5” AFF. Coordinate with new ramp elevation in the field. Extend piping connection as required. • Install existing cabinet unit heater approx. 1.5” AFF. Coordinate with new ramp elevation in the field, and extend piping connections as required. • Rebalance existing return diffuser to 235 CFM. Electrical: • Existing CUH to be removed and relocated. Disconnect power and make safe for reuse. • Existing light switch, timer switch clock, and sensor to be removed and relocated. Reuse existing wiring. • Relocated existing CUH, extend or cut back existing feeder as required and reconnect to CUH. • Provide add alternative pricing for electrical connection to motorized door, coordinate all electrical requirements with Architect and provide power and control wiring as required and interconnect push plates and electric strike. • 20A, 120V circuit from existing panel board within mechanical room (B015). Provide new 20A, 1P circuit breaker and ¾”C, 2#12, #12G feeder. (Approx. feeder length 75 ft.) • Relocated light switch, timer switch clock and sensor extend or cut back all wiring as required and reconnect onto new wall location.