Specifications include, but are not limited to: TRIM ALL OVERGROWTH - Trim all dead, decaying, damaged and overgrown plants, shrubs and trees, to provide safety and an attractive appearance. Remove 50% of the tree limb length that overhangs any structure. Remove all debris and rake clean; Remove and dispose of all roofing and defective sheathing. Synthetic felt and plastic cap fasteners. install ice and watershields in all valleys. Install preformed aluminum, drip edge and vent pipe boots. Install metal flashing around chimneysand metal wall flashing to prevent water intrusion, seal and caulk. Install a 220 lb fiberglass asphalt 3 tab shingle with a 25year warranty.Replace all flashing pipe vents and install 2 turbines. Labor will require 5 year wa