Specifications include, but are not limited to: - Construction of 4-lane roadway with new pavement, sidewalk, curb and gutter, median islands, and roundabout - Construction of new access road connecting the roundabout to the Old Silver Bowl Park - Concrete barrier and retaining wall along the west side of Wiesner Way - Removal and replacement of pavement and parking at the Old Silver Bowl Park - Street lighting, pavement markings, signage, ITS conduit and utility adjustments and relocations - Traffic signal poles and underground conduits at Galleria Drive and Wiesner Way and Hollywood Boulevard and Russell Road - Storm drainage facilities including drop inlets and pipes connecting to Wiesner Channel - Concrete transition structure and reinforced concrete box (RCB) connecting to the Wiesner Channel - Riprap channel along the west side of Old Silver Bowl Park