Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 4 025324 1.000 LS TRAFFIC CONTROL / 5 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART 6 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / Section 01 Total $4,030.00 Section 02 ASPHALT SURFACING ITEMS 7 060239 18096.000 TON HMA OVERLAY (SR-12.5A) (PG 64-22) / 8 081699 18096.000 TON QUALITY CONTROL TESTING (HMA) / 9 010256 47.440 TON EMULSIFIED ASPHALT (SS-1HP) / 10 081773 16207.000 TON MILLING / 11 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 12 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 13 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 14 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 15 081050 2257.000 TON PAVEMENT EDGE WEDGE (ROCK) / 16 070912 495.700 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 17 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / Section 02 Total $342.00 Section 03 PAVEMENT PATCHING (CONCRETE) 18 013302 627.000 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH) /