Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025324 1.000 LS TRAFFIC CONTROL / 4 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 5 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 6 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART Section 01 Total $4,030.00 Section 02 ASPHALT SURFACING ITEMS 7 060269 22629.000 TON HMA OVERLAY (SR-12.5A) (PG 70-22) / 8 081699 22629.000 TON QUALITY CONTROL TESTING (HMA) / 9 083447 44.000 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) / 10 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 11 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 12 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 13 070912 839.400 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 14 081773 21882.000 TON MILLING / 15 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / Section 02 Total $302.00 Section 03 RUMBLE STRIPS 16 072252 19.500 STA. RUMBLE STRIPS (MILLED) (ASPHALT) / 17 032406 608.900 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) / Section 03 Total Section 04 PAVEMENT MARKING ITEMS 18 023140 141766.000 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") / 19 023143 62540.000 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") / 20 023144 76.000 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") / Section 04 Total Item Total $4,332.00