Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025324 1.000 LS TRAFFIC CONTROL / 4 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 5 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 6 020001 1.000 LS $8,000.000 $8,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART 7 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 8 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 9 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 10 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 11 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / Section 01 Total $8,372.00 Section 02 US 50 ASPHALT SURFACE ITEMS 12 060276 23122.000 TON HMA OVERLAY (SR-12.5A) (PG 76-28) / 13 081699 23122.000 TON QUALITY CONTROL TESTING (HMA) / 14 010819 133.000 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) / 15 081773 23122.000 TON MILLING / 16 070916 30.700 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) / 17 070912 826.200 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 18 070918 42.000 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I) / 19 031904 128608.000 LNFT SAW AND SEAL JOINT (HMA) / Section 02 Total