Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025324 1.000 LS TRAFFIC CONTROL / 4 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 5 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 6 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART 7 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / Section 01 Total $4,280.00 Section 02 ASPHALT SURFACE ITEMS 8 060276 18068.000 TON HMA OVERLAY (SR-12.5A) (PG 76-28) / 9 060257 9209.000 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) / 10 081699 27277.000 TON QUALITY CONTROL TESTING (HMA) / 11 010819 235.000 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) / 12 081773 12019.000 TON MILLING / 13 031904 34254.000 LNFT SAW AND SEAL JOINT (HMA) / 14 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 15 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 16 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 17 081050 2656.000 TON PAVEMENT EDGE WEDGE (ROCK) / 18 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / 19 070912 840.900 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 20 070923 840.900 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II) /