Specifications include, but are not limited to: This project includes the replacement of water damaged sections of pavement with concrete road sections and valley gutters within four intersections along Scott Street in Willcox, Arizona. There will also be curb replacements at the intersections, as well as new curbs, pavement and sidewalks constructed along an approximately 600-feet stretch of Scott Street. The total area of improvements is over 5,000 square yards. The contractor shall furnish all materials, labor, equipment, services, transportation and perform all the work for the City’s project known as Scott Street and Sidewalk Improvements Project as called for in the plans/specifications. The proposer should prepare a detailed time schedule for completion. This is a Federally-funded project, and the successful proposer will be required to lend all possible assistance in the preparation, investigation and documentation necessary for compliance with all applicable federal Labor Standards/Davis-Bacon and other requirements of ADOH. The successful proposer should be prepared to comply with all local, state and federal safety and environmental requirements. The project shall be accomplished in accordance with all federal program and state statutory requirements to include 2 CFR 200, Executive Orders and the Arizona Administrative Code.