Specifications include, but are not limited to: 25’x70’ Asphalt Repair (Eastbound Near Railroad Tracks) Contractor shall mill full width of the asphalt on President Street in the eastbound lanes near Kemira Road to a depth of 2”. Area shall be cleaned thoroughly and apply tack coat, spot level areas that have settled, then pave with approximately 2” of asphalt. President Street will require restriping disturbed lines to match current existing. 25’x32’ Asphalt Repair (Westbound near intersection of Runaway Point) The Contractor shall mill tie ins to a depth of 2”, area shall be cleaned thoroughly and apply tack coat, level area with asphalt that has settled and create a smooth transition at joints. President Street will require restriping disturbed lines to match current existing. 24’x375’ Asphalt Repair (At intersection of Raleigh Drive) The Contractor shall mill full width to a depth of 2”, area shall cleaned thoroughly and apply tack coat, shall be paved with 2” of asphalt. Laroche Avenue will require restriping the disturbed lines to match the existing.