Specifications include, but are not limited to: - The Contractor's bid prices shall be inclusive of technical expertise, labor, material, radios and radio equipment, parts, taxes, insurance, overhead, travel, and incidental costs necessary to maintain and repair the elevators, escalators, chair lifts and elevator pit sump pumps at the Daniel K. Inouye International Airport. The State accepts no responsibility for Contractor's ability to meet the performance requirements of these specifications through the use of Appendixes A, B, C, D and E. These appendixes are included to provide a general idea of the airport layouts. It is the Contractor's responsibility to determine the actual layout, equipment counts, part lists, and system configuration in order to provide the services outlined in these specifications. The Contractor shall accept all equipment in “as-is” condition on the date specified in in the Notice to Proceed. A. The Contractor shall furnish the State with telephone numbers through which the Contractor can be called by the State during regular and off-hours. All telephone numbers shall be local. B. The Contractor shall present his work sheets or trouble call tickets to the authorized State representative for certification at the end of each day or job whichever is earlier. The trouble call ticket shall include all chargeable time and material for equipment repaired.