Specifications include, but are not limited to: EMERGENCY REPAIR MEASURE #1 Item #1 Roof Replacement: Specifications: CONTRACTOR TO PROVIDE ALL LABOR AND MATERIALS. Roof Replacement (15 Sq.) with asphalt shingles installed according the manufacturer instruction and by local code office. Apply 15# felt underlayment, (or synthetic felt underlayment) and 225# self‐sealing, 25‐year shingles. Install all roof material as specified by the manufacturer. Shingles applied to low sloped roofs (less than 4/12 pitch) must have ice and water shield applied under all the shingles and have no more than 3” shingle tab exposure. Use ice and water shield by TAMPKO and follow manufacturer’s directions to install. NO SHINGLES ARE TO BE APPLIED ON ROOFS WITH LESS THAN 3/12 PITCH WITHOUT PRIOR WRITTEN APPROVAL. New, standard aluminum drip edge shall be installed continuous around the roof corners. Provide a copy of all manufacturer’s warranties to owner. All valleys, flashings, boots and eave drips shall be installed, or replaced, during roof replacement. All valleys shall have ice and water shield installed in the valleys regardless of roof slope. Shingles are applied over the ice and water shield in the valleys. All sanitary sewer stacks and electrical masts projecting through the roof shall have new boot flashings. Boots and vents that are installed must fit tight to the roof surface and be set in roof cement such as Black Jack Waterproof Roof Sealant and be nailed on each corner, minimum. Where the roof intersects a vertical brick wall or chimney, the joints shall be flashed with aluminum step flashing and counter flashed. Where the roof intersects siding, the joint shall be flashed with aluminum step flashing that is tucked under existing siding. Repair of any damage to the existing siding during this operation is the responsibility of the contractor. NOTE: Measure to include shingle over ridge vents as needed for the project. When shingle over ridge vent is used the contractor must supply cap shingles to match roof shingle color and texture. RIDGE VENTS ON A DOUBLE WIDE MODULAR HOME MAY NOT BE FEASIBLE DUE TO THE LOW SLOPE ROOF. Each roof project to include up to 32 sq. ft of decking replacement if needed. Any raw decking installed to be painted. Repair Roof Sheathing ‐ Inspect the roof sheathing after all covering is removed and replace up to 32 SF of damaged roof sheathing to match existing sheathing in thickness. Notify the Project Supervisor immediately if additional sheathing replacement is needed REQUEST SITE VISIT. PHOTO’S REQUIRED BY CONTRACTOR FOR ANY ADDITIONAL MATERIALS NEEDED. Roof Demolition and Disposal – Strip all existing roof coverings to wood sheathing and properly dispose of waste and debris in an approved land fill. You must provide a copy of the landfill invoice with your final payment request. Item #2 Mobile Home Roof Vents: Specifications: Replace up to 5 Roof Vents on mobile home during roof replacement. Install per manufacturer instruction and by local code.