Specifications include, but are not limited to: The complete roadway project consists of two (2) phases. Phase II is solely the portion being bid by this invitation. Phase II will be constructed prior to Phase I with a required completion date of June 2024. Phase II will commence at the terminus of the proposed Phase I, extending north (existing City owned wastewater plant #3). Phase II is to be constructed on a combination of existing, acquired public rights-of-way and City owned land up to an existing CSX crossing. Phase II will be improved roadway construction with stormwater installations. The proposed road is to be two-lane (12’ lane width) based on an approved cross-section and current FDOT Roadway Design Standards. EOR and CEI Services are contracted separately. Existing Infrastructure (entire project Phase I/II): • Two existing intersections (north and south end). • Unimproved road running through subject location in various spots. • Approx. 3,200 linear feet of existing 16 inch PVC water main. • Approx. 3,200 linear feet of existing 24 inch PVC reuse water main. • Approx. 3,200 linear feet of existing 24 inch PVC sanitary sewer force main. • Various above-ground appurtenances (valves, fire hydrant assemblies) • Wastewater treatment plant – WWTP#3. • Industrial manufacturing facility near proposed road. • Residential properties along corridor. • Private utilities not limited to: Electric, Cable, Gas