Specifications include, but are not limited to: 1 Mobilization/ Demobilization 1 LS 2 Traffic Control 1 LS 3 Temporary Sewer Bypass Pumping 80 Setup 4a Manhole – Sewer Manhole Installation (4 - 6 FT Depth) 3 EA 4b Manhole – Sewer Manhole Installation (>6 FT Depth) 1 EA 5 Manhole – Locate Structure and Adjust Frame Height 2 EA 6 Manhole – Remove Concrete From Channel 1 EA 7 Manhole – Remove Interior Elbow and Patch Pipe Seal 1 EA 8a Pipe – Sewer Lateral Point Repair (3 L.F. long), 6-inch Dia. (4' to 6' Depth) 3 EA 8b Pipe – Sewer Lateral Point Repair (3 L.F. long), 6-inch Dia. (10' to 11' Depth) 1 EA 9a Pipe – Full Length Dig Replacement, 4-inch Dia. Service Lateral, from Mainline Sewer to ROW 210 LF 9b Pipe – Full Length Dig Replacement, 6-inch Dia. Service Lateral, from Mainline Sewer to ROW 2,040 LF 10a Pipe – Sewer Point Replacement, 8-inch Dia. Mainline x 4-inch Dia. Service Wye Fitting 10 EA