Specifications include, but are not limited to: 0010 202.10 REMOVING EXISTING SUPERSTRUCTURE (PROPERTY OF CONTRACTOR) LUMP SUM LUMP SUM _________._____ _________._____ 0020 202.12 REMOVING EXISTING STRUCTURAL CONCRETE CY 8.000 _________._____ _________._____ 0030 202.13 REMOVING EXISTING RAILINGS (RETAINED BY DEPARTMENT) LF 120.000 _________._____ _________._____ 0040 202.202 REMOVING PAVEMENT SURFACE SY 700.000 _________._____ _________._____ 0050 203.20 COMMON EXCAVATION CY 1,010.000 _________._____ _________._____ 0060 203.24 COMMON BORROW CY 50.000 _________._____ _________._____ 0070 304.10 AGGREGATE SUBBASE COURSE - GRAVEL CY 900.000 _________._____ _________._____ 0080 403.2081 12.5 MM POLYMER MODIFIED HOT MIX ASPHALT T 183.000 _________._____ _________._____ 0090 403.2131 12.5 MM POLYMER MODIFIED HMA BASE T 206.000 _________._____ _________._____ 0100 409.15 BITUMINOUS TACK COAT - APPLIED G 80.000 _________._____ _________._____ 0110 502.21 STRUCTURAL CONCRETE, ABUTMENTS AND RETAINING WALLS CY 6.000 0120 502.26 STRUCTURAL CONCRETE ROADWAY AND SIDEWALK SLABS ON STEEL BRIDGES LUMP SUM LUMP SUM _________._____ 0130 502.291 SAW CUT GROOVING LUMP SUM LUMP SUM _________._____ 0140 502.49 STRUCTURAL CONCRETE CURBS AND SIDEWALKS LUMP SUM LUMP SUM _________._____ _________._____ 0150 503.17 MECHANICAL WELDED SPLICE EA 216.000 _________._____ _________._____ 0160 503.19 LOW-CARBON, CHROMIUM REINFORCEMENT - FABRICATED & DELIVERED LB 9,200.000 _________._____ _________._____ 0170 503.20 LOW-CARBON, CHROMIUM REINFORCEMENT - PLACING LB 9,200.000 _________._____ 0180 505.08 SHEAR CONNECTORS LUMP SUM LUMP SUM _________._____ 0190 507.0821 STEEL BRIDGE RAILING, 3 BAR LUMP SUM LUMP SUM