Specifications include, but are not limited to: 1. Removal, handling, transportation, and disposal of a minimum of 112,000 cubic yards of sediment from Falling Creek Reservoir. 2. Providing a submerged forebay berm. 3. Construction of temporary staging and support areas. 4. Providing temporary and permanent access roads. 5. Providing a permanent access ramp in Falling Creek Reservoir. 6. Improvements to Burnt Oak Drive. 7. Clearing and grubbing of existing lands. 8. Grading and providing stabilized embankments, including mechanically stabilized earth slopes, soil nail walls and concrete gravity walls. 9. Demolition of existing marine structures and Underground Facilities. 10. Erosion and sediment control measures for protection of the site throughout construction. 11. Final stabilization and restoration of disturbed areas as shown and specified.