Specifications include, but are not limited to: EOU’s vision is to remove and re-install the Grand Staircase to current code, industry best practices, permit requirements, and within the current budget constraints. Phasing is an option if funding is inadequate. Owner’s Project Goals and Objectives - Maintain a safe, injury free work site and implement Quality Assurance and Quality Control (QA/QC) throughout the project. Establish a collaborative relationship between the Owner and Design-Build Team to deliver a quality design and construction, on-time and within budget. Maximize scope within the Project Budget while installing infrastructure that will last another 75 years. EOU does not want to re-visit installed infrastructure on this project within the standard lifecycle of the infrastructure installed. Minimize impacts to the Owner’s students, faculty, and staff through close coordination with the Owner.