Specifications include, but are not limited to: 1. Administration Building: Equipment • AHU (2) • Controls (Controllers/End Devices) • Chilled Water Pump • Computer Room A/C unit • Split system (2) Expected Service o 1 Belt change per year o 4 Preventive Maintenance (Quarterly) o 4 Filter Changes (Quarterly) 2. Communication Center Building: Equipment • AHU • Boiler • Hot Water Pump • (2) Chilled Water Pump Expected Service o 1 Belt Change o 4 Preventive Maintenance o 4 Filter Changes 3. Becker Hall: Equipment • Split System Cooling Only • Split System Cooling w/Gas Heat (6) • Unit Heater Expected Service o 4 Preventive Maintenance o 4 Filter Changes 4. Coleman – Webb Hall: Equipment • AHU • Boiler, Gas Fired • Scroll Chiller, Air Cooled • Circulating Pump (2) Expected Service o 4 Preventive Maintenance o 4 Condenser Coil Cleaning 5. Cosmetology/Child Development Center Building: Equipment • AHU (2) • Boiler, Gas Fired • Scroll Chiller, Air Cooled • Chilled Water Pump • Hot Water Pump (2) • Unit Heater, Hydronics (14) Expected Service o 1 Belt Change o 4 Preventive Maintenance o 4 Filter Change o 4 Air Filter Change on compressed air supply