Specifications include, but are not limited to: The City of Hot Springs, Arkansas (Owner) is requesting Statements of Qualifications (SOQ) from General Contractor Construction Manager (GC/CM) companies (Proposer) for pre-construction, procurement, construction management, and construction of the following Project packages: PACKAGE A Gulpha Basin Pump Station Improvements: Construct a new 22 MGD submersible pump station, valve vault, screening structure, electrical building, diesel motor driven generator with ATS. PACKAGE B Davidson Drive Wastewater Treatment Plant Improvements: Aeration system improvement to increasing the biological capacity from 12 MGD to 16 MGD, Increase the hydraulic capacity from 24 MGD to 48 MGD, Yard Piping Improvements, New secondary clarifier, new chemical feed building, new diesel driven electric generator with ATS. PACKAGE C Davidson Drive Wastewater Treatment Plant UV Disinfection: Increase the capacity of the UV Disinfection system from 44 MGD to 75 MGD PACKAGE D Davidson Drive Wastewater Treatment Plant Outfall: Construct approximately 1,600 linear feet of 54-in. pipeline from the WWTP to Lake Catherine PACKAGE E Davidson Drive Wastewater Treatment Plant Lake Catherine Marine Phase: Construct approximately 300 linear feet of buried 54-in. pipeline and 80 linear feet of 54-in diffuser in Lake Catherine with anchor piles secured in rock.