Specifications include, but are not limited to: 1. Install 6-Inch Class 250 PVC Water Line 16,348 LF 2. Install 6-Inch Pressure Class 350 Ductile Iron Water Line 1,000 LF 3. Install 4-Inch Class 250 PVC Water Line 2,268 LF 4. Install 2-Inch Class 250 PVC Water Line 3,062 LF 5. Free Bore Under Driveway with 6-inch Class 250 PVC Water Line 48 LF 6. Bore and Jack 6-inch DIP Carrier in a 12-inch Steel Casing 130 LF 7. Bore and Jack 4-inch DIP Carrier in an 8-inch Steel Casing 68 LF 8. Bore and Jack 2-inch DIP Carrier in a 6-inch Steel Casing 24 LF 9. Connect to Existing 6-inch Water Line 2 EA 10. Install 3/4-inch Type K Copper Service Line 7,903 LF 11. Install 1-inch Type K Copper Service Line 4,360 LF 12. 6-inch Gate Valve with Valve Box 4 EA 13. 4-inch Gate Valve with Valve Box 8 EA 14. 2-inch Gate Valve with Valve Box 2 EA 15. 3/4-inch Air Release Valve Assembly 13 EA 16. Install Fire Hydrant Assembly 8 EA 17. 2-inch Blowoff Assembly 2 EA 18. Pavement Replacement 250 LF 19. LMI - Water Meter Assembly (Including Meter) 59 EA 20. Non-LMI - Water Meter Assembly (Including Meter) 7 EA