Specifications include, but are not limited to: The designed improvements will include operational and safety improvements along Main Street/CT Route 63 between Baldwin Street and French Street. The selected Consultant will review previous studies and recommendations developed by the town and will coordinate with other ongoing design and construction projects within the project limits. Additionally, the Consultant may be asked to develop conceptual plans for the remainder of Main Street from French Street to Oakville Center and the Waterbury town line. Study and design goals include the following: • create a safe and walkable town center • balance the needs for all travel modes • enhance safe bus transit connectivity • accommodate individuals ranging in physical ability • consider the necessary interactions between roadway and adjacent land uses • incorporate linkages to community resources such as off-street parking and Steele Brook Greenway • establish gateway treatments and changes to the character of the corridor to influence driver behavior • promote economic development • improve quality of life for our community