Specifications include, but are not limited to: A. The Contractor’s proposed solution shall include the design, engineering, equipment and installation, software, licenses, implementation services, operator and technical training, and continued maintenance services for a state-of-the-art P25 Phase 2 public safety trunked radio system. B. The P25 system shall provide all of the components of an APCO Project 25 standardsbased digital communications network to meet the current and the foreseeable future needs of the County. C. The Contractor shall assume complete responsibility for the system design, engineering, hardware, software, functionality, radio coverage, licensing, installation, optimization, testing, training, cutover, and maintenance of the P25 compliant, digital trunked communications system, based upon the performance specifications and features contained in this document and in the P25 standards. D. The Contractor shall complete and pass all acceptance tests of system components, including hardware, software, radio coverage, reliability, and the required functionality per the requirements of this ITN and the P25 standards. E. The Contractor shall propose a complete and fully operational system that meets or exceeds the requirements herein. F. If the Contractor’s system, as installed, does not meet the contractual technical and functional requirements, all additions or modifications required in meeting those technical and functional requirements to satisfy the communication needs of the County shall be at the sole expense of the Contractor.