Specifications include, but are not limited to: Repairs: o Structural: Total Building size – 2,003 sq. ft., four (4) offices, one (1) mechanical closet, restroom (in the vestibule), restroom (back), corridor, janitor closet, conference room, lobby, server closet: ▪ Room Specifics: • Office 1 – 238 sq. ft. • Office 2 – 168 sq. ft. • Office 3 – 168 sq. ft. • Office 4 – 238 sq. ft. • Mechanical Closet – 42 sq. ft. • Restroom (Vestibule) – 35 sq, ft. • Restroom (Back) – 56 sq. ft. • Corridor – 176.5 sq. ft. • Janitor Closet – 48 sq. ft. • Conference Room – 420 sq. ft. • Lobby – 388.5 sq. ft. • Server Closet – 25 sq. ft. ▪ Remove and store existing contents of offices at an approved facility at no additional cost to the State. ▪ Remove and replace exterior concrete stairs with new concrete stairs ▪ Remove wall paneling, toilet, sink and flooring in water damaged areas and inspect for insects, rodents, mold, fungus and replace if damaged. ▪ In janitor’s closet, remove the hand sink and the mop sink, cabinets, floors and walls; install dry wall and install new ceramic flooring and base; paint; install new cabinet section on floor (60” x 21.5”) and a wall cabinet (30” x 12”); Install new drywall & insulation in walls and ceilings; install new commercial base. ▪ Remove and replace a total of 16 windows: B2021 - Window, Vinyl-Clad Double-Glazed, 16-25 SF ▪ Paint walls and ceilings in flat finish. ▪ Prime, prep subfloor; install new LVT flooring & subfloor & shoe molding (TDF will provide the specifications); shore floor to movement; install new commercial base. ▪ Replace contents of offices and fixtures. Reinstall all previously removed and stored wall face plates. Reinstall toilet with a new wax ring and the sink. ▪ Do not reinstall the hand sink and mop sink in the mop closet. Repair and cap any plumbing, sheetrock any appropriate areas, and tile flooring where sinks were removed. ▪ Remove all job-related debris. o Electrical: in entire building ▪ Contractor must be a licensed electrician to perform this work and provide licensure upon request by the State of Tennessee. ▪ Replace distribution panel, 120/208 V, 200 AMP ▪ Inspect, test, and update any wiring not meeting code or working properly to current building code regulations approved by the State of Tennessee. ▪ Wire for internet, phone, and computer network to current building code regulations approved by the State of Tennessee. ▪ Replace all existing lights with new LED lighting. The current light specifics are as follows: • Office 1 – 4 fluorescent lights (13”x48”) • Office 2 – 4 fluorescent lights (13”x48”) • Office 3 – 4 fluorescent lights (13”x48”) • Office 4 – 4 fluorescent lights (13”x48”) • Mechanical Closet – 1 fluorescent light (4”x48”) • Restroom (Vestibule) – 1 light (bulb) with vent • Restroom (Back) – 1 fluorescent light (15” x 48”) • Corridor – 3 fluorescent lights (13” x 48”) • Janitor Closet – 1 light (bulb) with vent • Conference Room – 6 fluorescent lights (15” x 48”) • Lobby – 6 fluorescent lights (13”x48”) • Server Closet – 1 light (bulb) o Additional Specifications for Interior Finish Selections: ▪ 107 IRON FOR THE FLOOR TILE GROUT AS MANUFACTURED BY MAPEI ▪ 115 RIVER GREY FOR THE WALL TILE GROUT AS MANUFACTURED BY MAPEI ▪ LVT: WEATHERED OAK SS5W2524 MANNINGTON AMTICO ▪ CT RESTROOM FLOOR: ATLAS CONCORDE FORGE ALUMINUM ▪ CT WALL TILE: FLORIDA TILE RETROCLASSIQUE PEWTER 60366 ▪ SOLID SURFACE COUNTER TOP: ARRAY SHIMMERING PEARL A914 ▪ LAMINATE CABINETS: WILSONART BEIGEWOOD 7850-60 MATTE FINISH ▪ LAMINATE ADA APRON: WILSONART SATIN STAINLESS 4830-K-18 ▪ TOILET PARTITION: ASI METALLIC IN HAMMERED ▪ FIELD PAINT COLOR: SHERWIN WILLIAMS SHOGI WHITE SW 7042 ▪ ACCENT PAINT COLOR: SHERWIN WILLIAMS URBANE BRONZE SW7048 ▪ VINYL BASE: TARKETT 32 PEBBLE