Specifications include, but are not limited to: This project is generally described as water main installation and road reconstruction: Along N 3rd St from Read St to Park Ave; along N 2nd St from Main St to North of Park Ave; along Park Ave from 3rd St to 1st St. The improvements in include approximately: 3,033 LF of Trenched 6” PVC Water Main; 266 LF of Trenched 6” DIP Water Main; 100LF of Trenchless 6” DIP Water Main; 193LF of Trenchless 6” DIP Encased Water Main; 535 TONS of HMA Pavement; 4 railroad crossing approaches; 33 SY of PCC Sidewalk; 39 SY of HMA Driveway; 69 SY of PCC Driveway; 59 LF of Storm Sewer. Other associated improvements include, fittings, appurtenances, traffic control, erosion control, surface restoration, and miscellaneous work necessary to complete the project.