Specifications include, but are not limited to: A. Furnish and install all materials, labor, equipment, permits, etc., to provide communications system as described herein for a complete operating system. Awarded Contractor will be responsible for adequate coverage throughout the building including classrooms, hallways, gym, eating areas, kitchen, and common areas and outside the building. This must include providing hybrid IP option to feed separate buildings fed with fiber optic cable. B. All manufactured articles, material, and equipment shall be applied, installed connected, erected, used, cleaned, adjusted, and conditioned as recommended by the 21 manufacturers, or as indicated in their published literature, unless specifically herein specified to the contrary. C. All work shall be performed by competent professionals and executed in a neat and professional manner providing a thorough and complete installation. Work shall be properly protected during construction, including the shielding of soft or fragile materials. At completion, the installation shall be thoroughly cleaned, and all tools, equipment, obstructions, or debris present as a result of this portion of work shall be removed from the premises. Contractor shall be responsible for disposing of old equipment removed. D. Program the operational characteristics matching the operation described herein, adjusting for call routing, transfers, priorities, and volume levels. F. The Contractor shall provide a minimum of eight (8) hours of in-service training with this system. These sessions shall be broken into segments, which will facilitate the training of individuals in the operation of this system. Operator Manuals and User Guides shall be provided at the time of this training. G. The Contractor shall provide factory certification, all software and license keys for staff that will operate and maintain the system at the expense of the contractor. H. The Contractor shall be capable of service response within two (2) hours, 365 days a year, 24 hours a day.