Specifications include, but are not limited to: 1. The building has an existing rock ballast, EPDM rubber membrane roof systems. 2. On the roof, it is not limited to, there are existing roof top units, condensing units, makeup air units, heating units, exhaust fans, vent pipes, natural gas pipes, electrical conduit, roof drains, boiler vents, roof hatches, chimney, etc. 3. The contractor must remove the existing rock ballast from all roofing areas. The contractor must haul the rock ballast from the site and is responsible for disposing of. 4. The contractor must remove the existing metal roof edging and fascia and replace with new. Color will be selected after the contract has been awarded through the submittal process. 5. The contractor must remove the existing parapet coping and replace with new. Color will be selected after the contract has been awarded through the submittal process. 6. The contractor must only remove the amount of roofing that can be replaced back the same day. Contractor is responsible for securing all roof areas during construction. Contractor will be responsible for any damages caused from water leaks in any areas that are not watertight secured. 7. Metal desk areas: a. Remove existing roof system down to expose the deck. Replace all damaged or deteriorated deck approved by the owner using the square foot price submitted on the bid form.