Specifications include, but are not limited to: Furnish all labor, materials, equipment, appliances and perform all operations in connection with, and complete in strict accordance with, this section of specifications and the applicable drawings and subject to the terms and conditions of the contract for the following work: A. Electrical work associated with the systems including, but not necessarily limited to: 1. All electrical installation including power distribution and special systems, is included in the scope of the general contract. Of specific concern are the control systems related to mechanical equipment. Responsibility for the control work is divided between the project electrician (Division 26) and his controls subcontractor. HVAC related I/O and Control as indicated in drawings. 2. All electrical work shall be in accordance with Division 26. 3. Division 26 shall provide all power to and throughout the building, to include motor control centers, breaker panels, and all other systems designated to Division 26, and specified herein. Division 26 shall install all conduit systems. 4. Division 26 shall run and connect all wiring and devices which power or control motors and other mechanical or control devices. Where control devices are located in power circuit, the controls contractor shall interrupt the circuit in the mechanical equipment junction box, wire through the control device and back to the junction box. 5. Breakers and disconnects, auxiliary contacts, standard pilot lights and magnetic starters are the responsibility of Division 26 and shall be as specified herein. 6. Auxiliary relays, low voltage transformers, control panel switches and devices, thermostats, pressure switches, electric operated valves, etc., are the responsibility of Division 26. 7. All wiring shall terminate at labeled terminal strips.