Specifications include, but are not limited to: Remove existing asphalt SBS modified built up roof down to metal deck Remove roof top PA speakers and reinstall to front of wall of press box Remove existing guard rail and replace with new safety guard rail system per FBC/OSHA standards Install new modified bitumen 2 ply polyester reinforced roofing, new insulation and new flashing. Install new SS 26 Gage edge flashing metal fastened per mfr. Installation instructions Install any new flashing for new roofing install at hatch and other existing penetrations. Extend curbs with 032 aluminum system or equal if required or if damaged per new roof height based on roofing system and SDPBC curb height requirements Existing roof hatch to remain, replace curb if damaged. All curbs, equipment and accessories are to be attached to comply with ASCE 7-22 Criteria 2022 ED. Install new aluminum gutter and leader Existing A/C unit on side wall to remain. Hurricane cable to be provided at all roof top equipment if damaged or missing. Reference files attached: ARCH-100%-CD-08.21.2023(1), SPECS-100%-CD-08.21.2023(1), and STRUC-100%-CD-09.13.2023 Contractor shall be responsible for the repair or replacement, including but not limited to: all surfaces, building elements, fencing, utilities, onsite and offsite elements, sidewalks, grasses, plantings, irrigation and hardscape disturbed by and/or damaged by construction activities. Contractor to remove and/or modify chain link fencing, including adding gate(s) as required for site access. Openings in fence shall be secured at the endo of each workday. Fencing to be restored to equal or better condition upon the completion of the work.