Specifications include, but are not limited to: All buildings on the site will be removed down to the basement floor, if a basement exists, to include all walls. All excavations shall be filled, compacted and graded so lot is level with the adjoining grades and lots. Until actual demolition of structures starts, structures shall remain secured and not accessible to the public. After demolition has started, the Contractor shall have a maximum of seven (7) days to remove said structure. The excavation will be backfilled with a homogenous soil material approved by the City of Junction City Building & Codes staff. No concrete, rocks, bricks, trash or other construction debris is to be placed in any backfilled area. The Contractor shall contact the City of Junction Building & Codes department prior to start of any backfilling. The Contractor shall take care of all public utilities encountered in connection with this work. He/She shall make all necessary arrangements, and provide all services required in the care of gas pipes, water pipes, sewer pipes, electric wires, telephone and TV cables. The Contractor will seal the sanitary sewer in an approved manner, below grade at the foundation location. The Contractor shall call the City of Junction City Building & Codes Department for a sewer cap inspection before any backfill is placed. Improvements not part of the project, such as sidewalks, curbs, driveways, roadway pavement and any other improvements removed, broken or damaged by the Contractor shall be replaced or reconstructed with the same kind of materials found on the work or the material of equal quality. The new work shall be left in serviceable conditions satisfactory to the Codes Administrator whenever a part of a square of slab or existing concrete sidewalk shall be removed and the concrete reconstructed. Damaged improvements shall be repaired at the Contractor’s expense.