Specifications include, but are not limited to: a. Provide Labor, Tools, and Materials to replace the designated boiler as requested. b. Demolition and Disposal of the existing unit. c. Installation of the new boiler meeting the specifications given in Exhibit K below d. Gas and Water Piping reconnections e. Exhaust reconnection f. Crane Service and a complete factory startup of all new equipment g. Installation of a chemical/testing system of the pot feeder variety to allow for testing and chemical introduction h. General requirements and specifications of the new unit: ▪ MIN BTH 1000 ▪ Cast Iron Headers ▪ 88% Efficiency ▪ Finned Copper Tube Heat Exchanger, ASME 160 psi Max WP, ▪ 4-Pass Design ▪ Stainless Steel Jacket Panels ▪ Bronze Headers – Water Heaters ▪ Cast Iron Headers – Boilers ▪ Variable Speed Blower ▪ Digital Text Annunciator ▪ Mounted & Wired Flow Switch ▪ Flame Safeguard Control ▪ Quick-Release Service Latches ▪ Small Vent Sizes ▪ Seismic Restraint Base Assembly ▪ Integrated Boiler Management System ▪ Modbus Protocol for BMS Communications ▪ Category II and IV