Specifications include, but are not limited to: 1. The contractor shall demolish the pool, equipment, walls, equipment room and flooring, and pool decking. The pool deck will be sawcut at a marked cold joint on the building side. Caution shall be taken to protect this area and structures. Any damage shall be the contractor’s responsibility to repair. 2. The contractor shall remove all non-concrete, metal and any other non-concrete material debris from state property and properly dispose of off-park within applicable regulations. Concrete shall be broken into 5-inch or less pieces for use by contractor to subbase material for final slope with excess to armor the ditch line adjacent to the pool to prevent erosion. The contractor shall demo the pool liner by cutting into sections or using equipment to remove and load for disposal. 3. The contractor shall demo any metal found in pool demo site. This metal must be removed from state park property and is up to contractor for disposal off-park. No brokenup aggregate shall be used as backfill if it contains metal or re-bar. 4. The contractor shall compact replacement fill dirt at 1-foot intervals with vibratory roller compaction. It shall be acceptable for the contractor to break aggregate into pieces no more than 5 inches in size and add a layer of broken aggregate at 1-foot intervals. Each foot of fill soil shall have no more than 6-inches of broken aggregate added on top. There shall never be pieces of aggregate more than 5-inches in size added to fill. 5.The contractor shall supply suitable fill material of suitable backfill not containing rock as needed to within 1-foot of grade. The contractor shall supply and compact 1-foot of topsoil for final grade. The finish slope from remaining pool deck section to surrounding area shall be filled and sloped to a 3:1 slope.