Specifications include, but are not limited to: Resurfacing 6th Street (Iowa St. to Massachusetts St.), Storm Sewer Improvements (Bluffs Drive to Missouri Street), Traffic Signal Improvements, and Waterline Improvements on 6th Street (Bluffs Drive to Maine St.). The Project includes, but is not limited to the following approximate quantities of Work: 48,412 S.Y. of Milling, 7,069 Tons of Asphalt Surface Course (2”), 6,223 L.F. of Concrete Curb and Gutter, 3,211 S.Y. of Concrete Pavement, 2,824 L.F. of Storm Sewer (15” to 66”), 41 Each Storm Sewer Structures, 3,176 S.Y. of Concrete Sidewalks (4” & 6”), Traffic Signal Improvements and Adjustments, 3,028 L.F. of Waterlines (4”,6” & 8”) to be constructed by Open Cut and by Horizontal Directional Drill, Permanent Signing, and 24,608 L.F. of Pavement Marking (various widths and colors).