Specifications include, but are not limited to: vThe project includes the installation of approximately 1850 LF of two (2) parallel 30-inch HDPE sub-aqueous force main canal crossings to replace the two (2) existing canal crossings. The proposed pipelines will be installed via Horizontal Directional Drilling, crossing the Flamingo Waterway. They will replace the existing 24-inch CIP force main aerial crossing (located along the center section of bridge # 874712, owned by Miami Dade County) and a 30-inch CIP force main subaqueous crossing located along the west side of the bridge. The entry/exit pits and connections to the existing force mains will be made at the uplands of the Flamingo Waterway, and the existing force mains will be capped and abandoned in place. The work consists of but is not limited to the following: 1. The purchase, delivery, and installation of contractor-furnished materials and equipment necessary for the complete replacement of a section of 24-inch force main and 30-inch force main within the project site, with two (2) new 30-inch HDPE force mains installed via Horizontal Directional Drilling (HDD). 2. Replacement, including cleaning and testing as required, sewer service maintenance, and all appurtenant for miscellaneous items and work for a completed project.