Specifications include, but are not limited to: • resurface three (3) of six (6) Har-Tru tennis courts (south courts #1-3) in one 3-court battery, measuring 180’ x 120’. • replace three (3) pair of tennis net posts and center anchors with footers (extend (3) pair of 3/4” irrigation lines for net post sprinklers to the new PVC sleeves). • clean surface to remove visible surface algae and dead material. • remove old lines and nails, scarify surface as needed, redistribute excess usable green rock from the low end to the high end, apply sixty (60) tons of new Har-Tru material (± 20 tons per court) using laser guided grading equipment to help re-establish the original court slope and a more optimal surface depth. • install three (3) sets of new herringbone style line tapes secured with 2-1/2” aluminum nails to USTA specifications. • furnish and install three (3) pair of new NeverRust all-aluminum external wind net posts (black) and Streamliner tennis nets with center straps, and anchor mates with locking bands. • courts must be rolled to initial firmness. All wastes will be hauled off site by contractor. The awarded Contractor is responsible for all repairs, including complete restoration work to disturbed elements and surface areas due to construction activities and disposal of all debris and materials off-site.