Specifications include, but are not limited to: Bay County is requesting final cleaning on the building at the completion of project by a professional cleaning company. Work is included down below: Clean the inside and outside of all windows, including window sills Wipe down all interior walls and doors Clean sheetrock mud, paint and/or construction debris such as caulk and other materials off walls, window frames, door frames, cabinets, counters and etc. Sweep and mop all hard floor surfaces Vacuum carpet areas Clean all bathroom fixtures and kitchen fixtures. Polish Stainless Steel Products Dust Clean and wipe down cabinets and counter tops. Wipe down owner provided kitchen equipment. Move minor debris and trash Wipe Mirrors Project Management and Coordination Submittal Procedures Quality Requirements Temporary Facilities and Controls Cutting and Patching Closeout Existing Conditions: The subcontractor that bids work must provide a full turnkey lump sum price Geotechnical Recommendations. Concrete: The subcontractor that bids Concrete work must provide a full turnkey lump sum price Cast-In Place Concrete Formwork for cast-in-place concrete Formwork accessories Form stripping Reinforcing steel for cast-in-place concrete Concrete curing Under Slab Vapor Barrier Furnishing & Installing fill material. Installing to correct elevation and compacting to meet standards set forth in Geotechnical Report. Furnishing and installing the proper rebar and wire mesh Cast-in-place concrete, including for the following o Slab on grade o Equipment Pads and bases. Masonry: This is the masonry wall being constructed around the outside units, include the installation of block. Grout blocks according to plans and specification. Unit Masonry