Specifications include, but are not limited to: o The proposal will include material, labor and equipment to remove the current poured-inplace surface and install the new tiled surface and concrete curbing. . Concrete Curbing and Curing: - The concrete mix shall be in accordance with Section 11 20 of the City of Kearney Standard Specifications for Municipal Construction (available under the Public Works Department at www. citvof kearnev.oro. - The concrete shall be placed, consolidated to fill all voids, struck off to the required grade and floated smooth. After the water sheen has disappeared, the surface should be lightly brushed to a uniform texture. - ln order to deter vandalism to the newly poured concrete slab, the Contractor should remain on site until concrete has cured. Contractor shall be responsible for removal, and replacement of concrete if vandalized prior to completion of entire job. - Within 2448 hours of the concrete slab being poured, all forms shall be pulled and removed from the site. - Within 48-72 hours, the concrete shall be scored. Scoring should correspond to the dimensions of the curbing. . Concrete & Material Clean-up: All excess "cleaned out" concrete shall be removed by the Contractor. All forms of any other materials generated from the construction of the project shall be removed by the Contractor. o Site Restoration: Any areas that have been destroyed, or areas where ruts and depressions have been created, will be restored to the same grade and condition as the surrounding area by the Contractor. The City will be responsible for any necessary irrigation work and re-seeding or sodding. . Underground Utility Locations: Contractor is required to call Digger's Hotline to locate all utilities prior to construction as necessary. . Contractor must provide safety fencing or flagging, minimum four feet (4') high, around the perimeter of the construction area.