Specifications include, but are not limited to: MICROSURFACING-LEVELING COURSE 6,900.00 SQYD, MICROSURFACING-SURFACE COURSE - TYPE D 6,900.00 SQYD, MOBILIZATION FOR MILL & TEXT (KY 1268) 1.00 LS, ASPHALT PAVE MILLING & TEXTURING 15.00 TON, CL2 ASPH SURF NO.4D PG64-22 300.00 TON, ASPHALT MATERIAL FOR TACK NONTRACKING 30.00 TON, TEMPORARY SIGNS 444.00 SQFT, MAINTAIN & CONTROL TRAFFIC (KY 1268) 1.00 LS, MAINTAIN & CONTROL TRAFFIC (KY 1268) 1.00 LS, PAVE STRIPING-TEMP PAINT-4 IN 38,850.00 LF, OVERBAND CRACK SEALING 4,950.00 LB, MICROSURFACING-LEVELING COURSE 34,500.00 SQYD, MICROSURFACING-SURFACE COURSE - TYPE D 34,500.00 SQYD, MOBILIZATION FOR MILL & TEXT (KY 1268), ASPHALT PAVE MILLING & TEXTURING 25.00 TON, CL2 ASPH SURF NO.4D PG64-22 1,500.00 TON, ASPHALT MATERIAL FOR TACK NONTRACKING 15.00 TON