Specifications include, but are not limited to: This project is for construction of the widening of CR 58 from a two-lane undivided asphalt roadway to a four-lane concrete boulevard roadway. The project scope also includes reconstructing an existing local unpaved street, Angelina Drive, as a two-lane undivided roadway from CR 48 to Victoria Avenue. The project consists of grading, removals, reinforced concrete pavement, asphalt stabilized base, cement stabilized base, lime treated subgrade, shared use path, drainage swales, storm sewer, detention basins, SW3P, signal work, driveways, and MUD No. 21 waterline and force main relocations. The approximate project limits are from CR 48 to Savannah Development which is approximately 0.55 miles.