Specifications include, but are not limited to: 1 General Clearing And Grubbing 1.00 Lump Sum $0.00 2 Large Tree Removal 11.00 Each $0.00 3 Excavation (Established Quantity) 1,046.00 Cu.Yds. $0.00 4 Water 1.00 M.Gal $0.00 5 Rock RipRap, Type B 465.00 Ton $0.00 6 Salvaging and Placing Topsoil 1,605.00 Sq. Yds. $0.00 7 Crushed Rock Surface Course 16.00 Ton $0.00 8 Incorporating Crushed Rock Surfacing 1.06 Station $0.00 9 Rental Of Crawler-Mounted Hydraulic Excavator, Fully Operated 4.00 Hour $0.00 10 Rental Of Front End Loader, Fully Operated 4.00 Hour $0.00 11 Rental Of Skid Loader, Fully Operated 4.00 Hour $0.00 12 Rental Of Dump Truck, Fully Operated 4.00 Hour $0.00 13 Mobilization (Group 1) 1.00 Lump Sum $0.00 Total Group 1 = $0.00 Group 5 - Landscaping 14 Erosion Control, Class 1D 1,760.00 Sq. Yds. $0.00 15 Temporary Erosion Checks, Type "Wattle" 100.00 Lin. Ft. $0.00 16 Erosion Checks, Type "Wattle" 405.00 Lin. Ft. $0.00 17 Mobilization (Group 5) 1.00 Lump Sum $0.00 Total Group 5= $0.00 Group 6 - Bridge 18 Remove Structure At Sta. 14+94.70 1.00 Each $0.00 19 Abutment No. 1 Excavation 1.00 Lump Sum $0.00 20 Abutment No. 2 Excavation 1.00 Lump Sum $0.00