Specifications include, but are not limited to: 1 General Clearing and Grubbing (N-024) 1.00 Lump Sum $0.00 $0.00 2 Excavation (Established Quantity) 393.00 Cu. Yds $0.00 $0.00 3 Water 0.66 M. Gal $0.00 $0.00 4 Salvaging and Placing Top Soil 1,261 Sq. Yds. $0.00 $0.00 5 Preperation of Intersections and Driveways 38 Sq. Yds. $0.00 $0.00 6 Crushed Rock Surface Course 126 Ton $0.00 $0.00 7 Incorporate Crushed Rock Surfacing 2.50 Sta. $0.00 $0.00 8 Rental of Crawler-Mounted Hydraulic Excavator, Fully Operated 4.00 Hour $0.00 $0.00 9 Rental of Front-End Loader, Fully Operated 4.00 Hour $0.00 $0.00 10 Rental of Skid Loader, Fully Operated 4.00 Hour $0.00 $0.00 11 Rental of Dump Truck, Full Operated 4.00 Hour $0.00 $0.00 Total Group 1 = $0.00 Group 4 - Culverts 12 Remove Headwall From Culvert 1.00 Each $0.00 $0.00 13 Excavation For Pipe, Pipe-Arch Culverts And Headwalls 37.00 Cu.Yds. $0.00 $0.00 14 24" Culvert Pipe, Type 3 48.00 Lin. Ft. $0.00 $0.00 15 24" Metal Headwall 1.00 Each $0.00 $0.00 16 Remove Driveway Pipe 25.00 Lin. Ft. $0.00 $0.00 17 18" Driveway Culvert Pipe, Type 3 32.00 Lin. Ft. $0.00 $0.00 Total Group 4 = $0.00 Group 5 - Landscaping 18 Erosion Control, Class 1D 1,542.00 Sq. Yds. $0.00 $0.00 19 Erosion Control, Class 2C 25.00 Sq. Yds. $0.00 $0.00 20 Fabric Silt Fence, Low Porosity 520.00 Lin. Ft. $0.00 $0.00 21 Fabric Silt Fence, High Porosity 21.00 Lin. Ft. $0.00 $0.00 22 Erosion Checks, Type "Wattle" 96.00 Lin. Ft. $0.00 $0.00