Specifications include, but are not limited to: • Project Management based on DEPARTMENT and Federal Highway Administration (FHWA) Major Project Management guidelines • Analysis and evaluation of operational and safety improvements • Traffic studies and modeling • Cost Estimates, Value Engineering, Cost Risk Analysis, Benefit/Cost analysis • Environmental studies and services to support NEPA approval • Subsurface Utility Explorations (SUE) and utility coordination • Surveying and aerial mapping • Public relations, outreach, and meetings • Right-of-Way support • Preliminary Geotechnical Report with borings • Develop alternative concepts, select preferred alternative, and prepare 30% level preliminary design and geometrics • Support for selecting delivery method